STRINGING OPERATIONS IN PROXIMITY TO HIGH-VOLTAGE LINES

DURATION: 

1 day

CONTENT THEORETICAL PART:

  • Basics about tensioning levels, minimum distance & safety distance, earth fault, delimitations for work under live lines step voltage, grounding resistance
  • Special features of the OPGW, OPPC installation and stringing operation of LWL lines
  • Installation methods (twin-line system, tri-line system)
  • Calculating the number of cradle blocks & synthetic fiber ropes (including application examples)
  • Calculating ropes
  • Alternatives to the default procedure
  • Accident prevention & occupational safety

CONTENT PRACTICAL PART:

  • Safe handling & proper mounting of the pulling robot
  • Correct use of cradle blocks, recovering device & line tensioner
  • Correct battery change
  • Operating the pulling robot in the testing area

QUALIFICATION/TARGET GROUP: 

Trainees, workmen, machine operators, site managers

THEORY/PRACTICE: 

Approx. 60 % theory & 40 % practice

PURPOSE: 

Gaining basic knowledge and expertise about stringing operations in proximity to live parts and system components. Successful participation will be verified through a certificate.

LOCATION: 

ZECK GmbH | Columba-Schonath-Str. 6 | 96110 Schesslitz

PRICE: 

On request

PARTICIPANTS: 

8-12 persons