TOWER ERECTION WITH DRUM WINCHES

DURATION: 

1.5 days

CONTENT THEORETICAL PART

  • Types of tower erection
  • Types & use of gin poles
  • Technical design of the equipment
  • Tower and gin pole calculations
  • Accident prevention & occupational safety

CONTENT PRACTICAL PART:

  • Positioning and anchoring machines
  • Tower erection of the first section with a drum winch
  • Installing the tension ropes and the support ropes
  • Lifting the gin pole to install the second section

QUALIFICATION/TARGET GROUP: 

Machine operators, site managers

THEORY/PRACTICE: 

Approx. 30 % theory & 70 % practice

PURPOSE: 

Gaining basic knowledge and expertise in tower erection with ZECK drum winches. Successful participation will be verified through a certificate.

LOCATION: 

ZECK GmbH | Columba-Schonath-Str. 6 | 96110 Schesslitz

PRICE: 

On request

PARTICIPANTS: 

4-14 persons

back to top