• RAIL TECHNOLOGIES

  • OVERHEAD TRANSMISSION LINES

  • UNDERGROUND CABLE

  • ROPEWAY

Tower Erection with Drum Winches

OBJECTIVE
Acquisition of basic and technical knowledge in operating ZECK drum winches. The successful participation is confirmed by a certificate.
TARGET GROUP
Site managers, machine operators, workmen
CONTENT

THEORY 

  • Methods of tower erection
  • Use and designs of gin poles
  • Design of technical equipment
  • Tower and gin pole calculations 
  • Accident prevention and occupational safety

PRACTICE

  • Positioning and anchoring of machines 
  • Erection of first section with a drum winch 
  • Installing the tension ropes and the support ropes 
  • Elevating the gin pole to install the second section
 
THEORETICAL /
PRACTICAL PART

Approx. 30% theory & 70% practice

LOCATION

ZECK Training Center 

PARTICIPANTS

4 - 12 persons

DURATION

1 1/2  day

PRICE
6500 € per persons (incl. beverages, lunch & dinner)

 

[SLIDE NOT FOUND]