  • Steel construction with ball bearing sheaves
  • Two sheave units that can be equipped with ropes of different lengths
Article no.Rope sheavesRope sheaves Ø

(mm)
Rope Ø

(mm)
Max. length

(mm)
upper

bore

(mm)
lower

bore

(mm)
Breaking load

(kN)
Max. lifting load = Max. working load

(kN)
Weight

2 pieces

(kg)
77-8030216083802212752520
77-80313160845025121053527
77-80325160850029121655545
77-8035218093702212903025
77-80363180943025121354530
77-80375180947029122107045
Max. lifting load: Calculated according to European standards (safety factor 3)
WIRE ROPE SLING
  • Galvanized steel rope with pressed slings
  • Tested according to DIN EN 1344-1
  • Sling size: 15 x rope Ø
Inclination angle0° – 45°45° – 60°
Article no.Rope Ø

(mm)
Working load

(kN)
77-811010108201410
77-8112121512302115
77-8114142016402820
77-8116162721.5543827
77-81181831.525634431.5
77-8120204032805640