• RAIL TECHNOLOGIES

    RAIL TECHNOLOGIES

  • OVERHEAD TRANSMISSION LINES

    OVERHEAD TRANSMISSION LINES

  • UNDERGROUND CABLE

    UNDERGROUND CABLE

  • ROPEWAY

    ROPEWAY

History

1918

Establishment of ZECK

Michael Zeck establishes a company specializing in the manufacturing, repair, and trade of agricultural machines.

1947

FRITZ ZECK JOINS THE BOARD 

In 1947, Fritz Zeck started working at ZECK after receiving training in agricultural machinery engineering from various companies like Allgaier-Porsche and Claas.
In 1953, he obtained his master's certificate in the trade of agricultural machinery, highlighting his expertise and dedication to the company.

1966

First construction of overhead transmission machines

Fritz Zeck begins the development and manufacturing of machines for the construction of overhead transmission lines.

1972

First puller-tensioner machine WB 1500/6

The ZECK Company achieves a significant milestone by developing the world's first puller-tensioner combination machine WB 1500/6

1977

Project Elbe Crossing

In a notable achievement, SIEMENS utilizes the ZECK PULLER (SPW5) to erect the world's tallest transmission tower at that time.
The tower is located near Stade, alongside the river "Elbe." With a remarkable height of 227 meters and weighing a staggering 1000 tons, this transmission tower becomes a prominent landmark.

1981

Synchronization System

First use of ZECK's synchronization system on construction site near Vienna, Austria

 

1984

Project Bosporus

380 kV Overhead transmission line over the Bosporus. SIEMENS utilizes ZECK pullers and tensioners. Find out more about the SIEMENS project

 

 

1993

Michael Zeck jr. joins the board | Relocation of ZECK

Michael Zeck Jr., the next generation of the Zeck family, assumes a significant role within the company by becoming a member of the board.

 

The company undergoes a relocation to a new and improved company building. 

1996

Production of catenary installation units

 ZECK expands its product offerings to include the production of catenary installation units. Marking a new milestone in rail technology.

2011

Founding of ZECK TSE, Thailand

Michael Zeck and Dirk Braun-Friderici establish ZECK TSE and launch ISO 9001-compliant production of braided steel ropes and steel reels

 

2013 

Project Gotthard Base Tunnel, Switzerland

The Gotthard Base Tunnel, which runs through the Alps in Switzerland, is the world’s longest railway tunnel. The overhead contact line, a catenary system Type Re250 GBT was installed with a ZECK Catenary Installation Unit BM 954 by Kummler+Matter.

2014

ZECK After Sales

Expanding after sales services with new complexes and testing area - 16,000 m²

2017

ZECK Acquires MDC, France

Maintenance du Centre located in Mignières/France is joining ZECK group and expands our product range, which now includes rail-road machines for catenary installation and rail construction.

 

2019

ZECK Servicepoint, Wolfenbüttel

Opening of ZECK Servicepoint in Wolfenbüttel, offering service and maintenance for rail-road vehicles.

2021

Fritz Zeck

After a fulfilling life, our company founder, Fritz Zeck, peacefully fell asleep on February 19, 2021.

We are very proud and grateful for the legacy he has left behind in his 91 years of life, and we will continue to pursue it in his spirit.

 

2022

ZECK Training Academy

Completion of the new ZECK Training Academy, providing training programs in overhead line construction.

 

1918 - 2023 The Company Chronicle for the 105th Anniversary.

Read online!